The TAB Technician will be able to review project/system drawings and specification data for facilities systems that provide HVAC services to the manufacturing facility and support areas.
Position Requirements
New Tool and support equipment installation
Activate/deactivate temporary exhaust
Rough balance (exhaust)
Final balance (exhaust)
Tool exhaust adjustment balance
Complete reports documenting activities and settings.
System support checks and inspections
Complete periodical flow and pressure checks (PMs)
Conduct internal inspections of systems with the use of a borescope
Investigate/Troubleshoot system concerns or issues.
Systems
Air delivery system balancing
Process exhaust and vacuum system balancing
Hydronic system balancing (Heating water, Chilled water, Condenser water, Process Water, City water)
Reporting Requirements
Create and file all reports in accordance with the procedures governing the TAB activity