Prior hands-on experience as a PM handling a Heat Exchanger/Main Condenser Replacement Experience
Nuclear Industry experience as a PM
Plus • PMP Certification • Primavera Scheduling Software proficiency • SAP System proficiency
Responsibilities • Ensure all projects are executed with Safety and Environmental Compliance as the primary focus of all personnel supporting his/her projects. • Manages or supports specific phases of major projects including project development support, site development, permitting support (air, water, state, local, etc.), scope development, major contract negotiations (equipment, engineering, EPC, etc), engineering, procurement, and construction contracts, construction activities, commissioning, and transition to operation. • Manages all phases of smaller improvement projects including permitting, contract negotiations, engineering contracts, construction contracts, construction activities and commissioning. • Develops and manages overall project budget and schedule for major and smaller projects. • Manage the approved project financial spend plan and cost forecast, making decisions to meet project financial goals. • Manage contracts / commercial aspects of the project with Dominion's suppliers and contractors. • Manage all project related administrative requirements as per PM process.
Project Overview
Replacement of the existing Vertical Feedwater Heaters in both operating nuclear units at a Station. Each Unit has 8 Vertical Feedwater Heaters. Planned approach entails full replacement of the Feedwater Heaters along with associated piping to eliminate Flow Accelerated Corrosion (FAC). This role will manage the scope, schedule and budget associated with the material procurement and the engineering/construction contractor implementation. A construction management team will be assigned to facilitate planning and oversight of vendor construction activities. An engineering design team will be assigned to support vendor design document owner's acceptance reviews as well as development and oversight of post modification performance testing and operational acceptance in support of system return to service activities. A cost controls team will be assigned to facilitate accurate cost forecasting and tracking.