Posted in Other about 3 hours ago.
About us:
North Tarrant Infrastructure, LLC is one of the subsidiaries of the Ferrovial Group in the U.S. It is currently working on several projects in the U.S., including the North Tarrant Express (NTE) Projects ("NTE Projects"). The NTE Extension Project is a part of the NTE Projects, which consist of a series of major highway improvements to the critical I-820 and SH-121/183 corridor in North Tarrant County, Texas. The NTE Projects will relieve congestion, improve safety, and provide for anticipated traffic growth in one of the country's fastest developing regions. The NTE First Project was a $1.451 billion design-build project consisting of rebuilding the existing main lanes as well as adding four toll-managed lanes, frontage roads and auxiliary lanes in the corridor between I-35 West and Industrial Boulevard. The NTE Extension Project is the next part of the NTE Projects. The construction of the original $984 million part of the project (Segment 3A) was completed by North Tarrant Infrastructure, LLC, and the current $580.5 million part (Segment 3C) of the NTE Extension Project is presently being carried out by North Tarrant Infrastructure, LLC.
Job Description:
Job Description
Position Summary:
The position of Field Engineer will support the Discipline Manager and coordinate the construction activities for certain construction activities of the project segment. The Field Engineer shall have the responsibility to support site administration and coordination of site operations, quality control, health and safety, and cost control for field operations of a defined area or type of construction activities for the project under the direction of the Discipline Manager.
Job Duties
McCownGordon Construction |
EC2 NORTH TARRANT INFRASTRUCTURE, LLC |